Home/Industries/Commercial Shipping

Industry · Commercial Shipping

Survey the hull at anchorage, not in dry dock.

Fleet operators have to balance inspection compliance against vessel uptime, and drydock-dependent surveys cost both. In-water hull survey, hatch-cover testing, tank inspection and in-place repair are the four places where that trade-off can actually be improved.

The operating problem

Every inspection competes with the trading schedule

Class requirements do not move, charter parties do not wait, and the cost of a day off-hire dwarfs the cost of most equipment. Almost every decision on a commercial vessel is that arithmetic.

Uptime

Dry dock is the most expensive place to find out

A survey that requires docking turns a condition question into a scheduling problem. Knowing the hull, propeller and anode condition while the vessel is still trading changes what you can plan for.

Claims

Wet cargo is cheaper to prevent than to argue about

Hatch-cover and watertight-integrity failures produce claims that are large, slow and difficult to defend. The test that would have caught it costs a fraction of the deductible.

Fuel

Fouling is a cost you are already paying

Hull and propeller condition drive fuel consumption continuously, not at intervals. Measuring it is what turns cleaning and coating from a calendar decision into an economic one.

What the equipment is actually for

Four jobs on a trading vessel

These are what fleet and technical superintendents come to us for. Everything below serves one of them.

01

In-water hull survey (UWILD)

Hull condition, biofouling assessment and anode checks performed at anchorage rather than in dock, with video streamed to shore teams in real time.

02

Propeller, rudder & anchor chain

Visual condition of the running gear and ground tackle - the components whose deterioration shows up as fuel burn and as detention risk.

03

Hatch cover & watertight integrity

Ultrasonic tightness testing that finds the actual leak path, rather than a hose test that tells you only that water got in somewhere.

04

Tank, pipework & steel repair

Cold-cure epoxy repair of corroded pipework, tanks, coolers and cylinders - in place, frequently without taking the system offline.

In detail

How each job is done, and with what

Where more than one of our brands suits a task, all of them are named.

ROV lit up alongside a ship's hull underwater

Hull & vessel inspection

UWILD hull surveys, biofouling assessment, anode condition checks, propeller and rudder inspection - performed at anchorage without drydocking. Real-time video can be streamed to remote technical teams via cloud platforms, so the surveyor does not have to be at the quayside.

ShippingUWILDBiofoulingAnodes
Suited platforms: Blueye, QYSEA, CHASING
Operator testing a hatch cover joint with an ultrasonic receiver

Cargo & watertight integrity

Ultrasonic hatch-cover tightness testing locates the leak path itself, and the same instrument family covers watertight door and compartment integrity. This is the test that stands behind a wet-cargo claim - or prevents one.

Hatch coversDry cargoClaimsSOLAS
Engineer working among pipework in a ship's engine room

In-place repair & protection

Cold-cure epoxy for ballast and seawater pipes, tank pitting, cooler end covers, hydraulic cylinder pitting, exhaust systems and hatch-cover corrosion. No hot work permit, no pre-heating, and it bonds to GRE pipe as well as steel.

PipeworkTanksExhaustABS certified
Proven in the field

Documented deployments of the systems we supply

Reported by the manufacturer and the operator - not our own project work.

Two Norwegian Customs officers beside a ship's hull
Photo: Blueye Robotics. Norwegian Customs officers.
Border controlBlueye RoboticsNorwegian Customs

Routine commercial hull checks without contracted divers

The challenge

Frequent hull inspection of visiting commercial vessels - checking for foreign objects and contraband attached below the waterline - while depending on contracted dive services for every single check.

The result

Norwegian Customs deploys Blueye ROVs for frequent commercial vessel hull checks, eliminating dependence on contracted dive services. The capability moved in-house, and inspection frequency stopped being limited by contractor availability.

Source: Blueye Robotics deployment documentation. Outcomes are as reported by the manufacturer and the operator.

View inside a water ballast tank from an ROV camera
ROV view inside a ballast tank. Still from Blueye Robotics' Noble Drilling tank inspection video.
Tank inspectionBlueye RoboticsNoble Drilling

Nineteen ballast tank inspections in two days

The challenge

Ballast tank inspection at a scale that would traditionally require confined-space entry, rope access or staged dewatering - multiplied across nineteen tanks.

The result

Noble Drilling completed nineteen ballast tank inspections in two days using Blueye ROVs. No confined-space entry was required for the survey itself, which removes the permit and standby burden as well as the time.

Source: Blueye Robotics deployment documentation.

Ultrasonic watertight testing, from the manufacturer. Nothing loads from YouTube until you press play.
If inspection is your business

Commercial inspection providers

Contractors and survey companies buy this equipment for a different reason: to widen what they can offer and to cut the personnel a job requires.

Scope

Multi-industry deployment

One platform covering shipping, ports, aquaculture and civil infrastructure rather than a vehicle per sector.

Output

Digital-first reporting

Structured records with timestamped video and annotated findings - deliverables clients can file rather than footage they have to interpret.

Acceptance

Class-certified data collection

Where the survey has to be submitted, the data-collection method matters as much as the finding. Confirm the specifics with your surveyor.

Reach

Remote expert review

Live streaming lets a specialist assess condition during the dive instead of reading a report days afterwards.

Common questions

What fleet operators usually ask first

Can ROV inspection data be used for class society submissions?

In the right configuration, yes. Some systems in our portfolio are class-certified for visual inspection and NDT data collection, and automated reporting tools generate structured records used in UWILD programmes - underwater inspection in lieu of dry-docking. The important caveat: requirements vary between class societies and by vessel, so always confirm the specific requirement with your surveyor before planning the programme. We will tell you which systems meet which certification rather than implying they all do.

Can the crew operate it, or do we need a specialist?

The crew. Modern compact ROVs are designed for single non-specialist operator deployment, and coastguard crews, customs officers and researchers routinely operate them without ROV pilot training. Deployment is typically three to five minutes from setup to water entry.

Do we buy one per vessel, or share across the fleet?

Both models work and the arithmetic depends on inspection frequency and trading pattern. A shared unit that travels with a superintendent suits a fleet on long voyages; a vessel-based unit suits frequent short calls where a condition question can arise at any port. Renting first is the cheapest way to find out which you actually have. See the rental fleet.

Expert guidance

Tell us the vessel and the problem

Vessel type, what you need to inspect or repair, and whether it has to satisfy class. We will recommend across the brands we carry rather than pushing one - including saying when the cheaper option is the right one.

Why ask us Our range spans several specialist manufacturers, so we can recommend the one that genuinely fits your job.
Procurement ShipServ TN 317548 - RFQs can go through your existing workflow.

Describe the vessel

We aim to reply within one working day with a specific recommendation.

We use your details only to answer this enquiry. No marketing list, no third parties. See our privacy & cookie policy.

Thank you - that's with us.

We will come back to you within one working day. If it is urgent, call +45 6916 2400.